Thursday April 5th
The major item on the agenda today was to install the new toilet parts. I waited until both of us were done with the bathroom and then began the project. As it turned out it was a pretty simple job except for the tight quarters. The hardest part was getting the water supply line reconnected after the parts were installed. There was very little slack in the supply line and I had to take the toilet off of its mounting bolts for a second time to get the toilet oriented in position for the supply line to get threaded on. The whole job, even with the partial re-do still only took about 90 minutes, so it wasn’t too bad.
Later we went to the grocery store in Gold Hill and picked up a few things, then went for a ride down the river for a few miles as far as the town of Rogue River. There is a winery (and vineyard) along the road about half way between Gold Hill and Rogue River called the Del Rio Winery.
Tomorrow is supposed to be sunny day so we are planning to make our trip to the coast to see the redwoods.
No comments:
Post a Comment